Energy design & system studies
The analytical work that decides whether a plant runs smoothly or trips on its own faults.
Consultancy · In short
Energy design and power system studies determine how an electrical network behaves under load and under fault. Enersys Engineers carries out fault level and fault MVA studies, relay coordination and protection grading, load flow and contingency analysis, earthing and step-and-touch potential design, and harmonic and power factor studies — producing the settings schedules and equipment ratings that the rest of the design depends on. These are design-stage studies; the operational counterpart, measuring a running plant to find savings, is covered under energy audit and energy management.
Fault level and short-circuit study
Calculates the maximum prospective short-circuit current at every bus. This is not an academic exercise — it sets the breaking capacity of every circuit breaker and the withstand rating of every cable, busbar and support insulator in the network.
- Three-phase and single-line-to-ground fault currents, bus by bus
- Peak make and symmetrical breaking duty for switchgear selection
- Cable and busbar thermal and electrodynamic withstand verification
- Contribution from motors and from embedded generation
- Verification against installed equipment ratings on brownfield sites
Relay coordination and protection grading
Determines the setting of every protective relay so that the device nearest a fault clears it first and the rest of the network stays energised. Without proper grading, a single feeder fault trips the whole plant.
- Time–current characteristic curves for the full protection chain
- Relay settings schedule, ready to be applied at site
- Discrimination check across every grading pair
- Differential, distance, earth fault and back-up protection settings
- Coordination with the utility’s upstream protection
Load flow, earthing and power quality
- Load flow under normal and contingency conditions — bus voltages, line loadings and system losses
- Reactive compensation and power factor improvement sizing
- Motor starting and voltage dip study
- Earthing grid design with step and touch potential checked against permissible limits
- Harmonic analysis and filter sizing for drive-heavy installations
- Energy audit and loss reduction assessment for operating plants
What you actually receive
A study is only useful if it changes a decision. Each of ours ends in a document an owner, a lender or an inspectorate can act on.
Why we run the study and build the switchgear
Enersys is unusual in carrying out the fault study and manufacturing the panel that has to interrupt that fault. When the calculation and the equipment come from the same organisation, the specified rating is the installed rating — and a setting change discovered during commissioning is made the same week rather than negotiated across a contract boundary.
Frequently asked
What is a fault MVA study?
Fault MVA is the short-circuit power available at a point in the network, expressed in mega-volt-amperes. It is the basis for selecting switchgear breaking capacity and for verifying that cables, busbars and supports can survive the mechanical and thermal stress of a through-fault.
How often should relay coordination be revisited?
Whenever the network changes — a new incomer, an added transformer, embedded generation, or a change in utility fault level. Settings that were correct at commissioning become non-selective as the system grows, which is a common cause of nuisance plant trips.
What software do you use for system studies?
Studies are carried out on industry-standard power system analysis platforms and issued with the input data, assumptions and single-line model documented, so the results can be independently verified.
Do you provide studies for existing plants, not just new ones?
Yes. Brownfield fault level verification and relay re-coordination after a network change are among the most common assignments, particularly for industrial plants that have expanded incrementally.
What usually goes with this
These are the adjacent scopes clients most often need alongside it.
Power system automation
Primary equipment decides what the system can do. Automation decides whether anyone knows what it is doing.
Read more →ManufacturingRelay & metering panels
The panel and the grading study come from the same team, so the settings that were calculated are the settings that get applied.
Read more →ConsultancyClient-side engineering support
Most owners do not carry the engineering headcount a capital project needs for eighteen months. This is that team, for exactly as long as the project runs.
Read more →OperationsTesting & commissioning
The point at which an installation becomes an asset. Everything that was assumed during design gets checked here.
Read more →Need energy design? Tell us the scope.
Send the voltage, the capacity and the site. You will hear back from an engineer within one working day.