Power trading & open access advisory
Open access is only worth doing once the surcharges are counted. We do that arithmetic before you apply, not after.
Consultancy · In short
Power trading and open access advisory helps an industrial consumer or generator buy or sell electricity outside the default utility tariff. Enersys Engineers supports open access applications to the state and central authorities, power exchange participation, PPA and captive structuring, banking arrangements, scheduling and settlement, and the commercial assessment of wheeling charges, cross-subsidy surcharge and additional surcharge that determine whether open access is actually cheaper. In Odisha the comparison is against the prevailing OERC retail tariff for the relevant licensee — TPCODL, TPNODL, TPWODL or TPSODL — with wheeling and surcharges as determined by OERC and concurrence from the Odisha SLDC.
Commercial assessment first
The headline exchange price is rarely the price you pay. Wheeling charges, transmission charges, losses, cross-subsidy surcharge, additional surcharge and standby charges all sit between the market rate and your landed cost.
- Landed cost comparison — open access versus the prevailing utility tariff, all charges included
- Cross-subsidy surcharge and additional surcharge assessment for your consumer category
- Transmission and wheeling loss estimation for the intended route
- Break-even analysis and sensitivity to exchange price movement
- Captive and group captive qualification testing against the 26% ownership and 51% consumption criteria
Approvals and connectivity
- Short-term, medium-term and long-term open access applications
- Nodal agency coordination — SLDC for intra-state, RLDC and CTU for inter-state
- Standing clearance and NOC from the distribution licensee
- Metering compliance — ABT-compliant special energy meters and communication
- Registration for power exchange participation
Ongoing operation
- Day-ahead and real-time scheduling and revision
- Deviation settlement mechanism exposure management
- Energy accounting reconciliation against SLDC and licensee statements
- Banking arrangement administration where the state framework permits it
- Renewable purchase obligation compliance and REC transactions
Frequently asked
Is open access always cheaper than the utility tariff?
No. Once wheeling charges, transmission charges, losses, cross-subsidy surcharge and additional surcharge are added, open access can be more expensive for some consumer categories and load profiles. The assessment should be done before the application, which is the first thing we do.
What is group captive and why does it matter?
Under a group captive arrangement, consumers collectively holding at least 26% of the generating company’s equity and consuming at least 51% of its generation are exempt from cross-subsidy and additional surcharge. The structure has to be maintained on an ongoing basis, and failing the test retrospectively is expensive.
Which approvals does open access need in Odisha?
Typically a NOC from the distribution licensee, open access approval from the nodal agency, SLDC concurrence for scheduling, and ABT-compliant metering. Inter-state transactions additionally involve the RLDC and the Central Transmission Utility.
What usually goes with this
These are the adjacent scopes clients most often need alongside it.
SLDC, RLDC & NLDC registration and scheduling
Registration is a one-off. Scheduling and deviation settlement are for the life of the asset — and they carry real money.
Read more →ApprovalsDISCOM approval & connection
The distribution licensee decides your supply voltage, your metering arrangement and your connection date. Those are engineering questions before they are administrative ones.
Read more →ConsultancySolar consultancy
Modules are the visible part and the smallest share of the risk. Yield, evacuation and availability are where a solar business case is won or lost.
Read more →ApprovalsCTU approval & inter-state connectivity
Inter-state access is a different regime from a state connection — longer lead times, formal milestones and bank guarantees that are actually called.